Upgrades and Renewals
2024 Levy Ongoing & Future Projects
Location | Description | |
---|---|---|
District-wide | Accessibility - ADA, Restroom Upgrades | |
Alderwood Middle | Field Turf | |
Brier Elementary | Boiler HVAC | |
Edmonds-Woodway High | Boiler HVAC | |
Hazelwood Elementary | Boiler HVAC | |
Hilltop Elementary | Boiler HVAC | |
Hilltop Elementary | Reroof | |
Lynnwood High | Dampers Piping | |
Meadowdale Elementary | Reroof | |
Meadowdale High | Softball Turf Field | |
Meadowdale High | Boiler | |
Meadowdale High | Baseball Turf Field | |
Meadowdale Middle | Field Project | |
Sherwood Elementary | Reroof | |
Stadium | Synthetic Track, Drainage | |
Various Locations | LEDs Retrofit Test Site (CVE, EWH, LWH, MDH) | |
Various Locations | Relocatables | |
Various Locations | Security Technology Lifecycle (+ Lockdown Indicators) |
2021 Levy Ongoing & Future Projects
Location | Description | Year to Complete |
---|---|---|
District-Wide | Accessibility Improvements | Ongoing |
District-Wide | Audio/Visual Upgrades | Ongoing |
District-Wide | Field Signage Standards (Initial Locations: CPE, CPM, EWH) | Ongoing |
District-Wide | Fire Alarm System Upgrades | Ongoing |
District-Wide | Portable Moves/Adds | Ongoing |
Edmonds Woodway High | Multipurpose Fields: Bleachers, Field House, & Restrooms | 2025 |
Maplewood Cooperative | Playfield Upgrades | 2027 |
Maplewood Cooperative | HVAC Upgrades & Gutter Replacement | 2026 |
Martha Lake Elementary | HVAC Upgrades | 2025 |
Meadowdale Elementary | HVAC Upgrades & Gutter Replacement | 2026 |
Meadowdale High | Multipurpose Fields: Soccer & Fast Pitch | 2025 |
Mountlake Terrace High | Exterior Cladding & HVAC Upgrades | 2025 |
Woodway Center (Elementary) | Parking Lot Paving & Walkway Canopy | 2026 |
Various Locations | Covered Play Areas (BRE, EDE, MLE) | 2025 |
2021 Levy Completed Projects
Location | Description | Year Completed |
---|---|---|
Beverly Elementary | Playground Upgrades | 2024 |
Cedar Valley Elementary | Gutter Replacement | 2024 |
Cedar Way Elementary | Boiler Upgrade | 2022 |
Chase Lake Elementary | Aluminum Storefront Replacement | 2024 |
Edmonds Woodway High | Stadium: Grandstand Railing, Fencing, & Gates | 2022 |
Hilltop Elementary | Playground Equipment & Walking Path Upgrades | 2023 |
Meadowdale High | Aluminum Storefront Replacement | 2024 |
Seaview Elementary | Roofing & Gutter Replacement | 2023 |
Sherwood Elementary | Playground Equipment & Walking Path Upgrades | 2023 |
2020 Levy Ongoing & Future Projects
Location | Description | Year to Complete |
---|---|---|
District-Wide | Security Cameras & Access Control, Phases 2 & 3 | 2025 |
2020 Levy Completed Projects
Location | Description | Year Completed |
---|---|---|
District-Wide | Security Cameras & Access Control, Phase 1 | 2022/23 |
Brier Terrace Middle | Softball Field Drainage & Track Surface Upgrades | 2024 |
College Place Elementary | Classroom Carpet | 2022 |
Edmonds Woodway High | Gym Bleachers | 2023 |
Edmonds Woodway High | Gym Sound System | 2020 |
Edmonds Woodway High | Kitchen & Weight Room Floor Repair | 2023 |
Edmonds Woodway High | HVAC Controls Upgrade | 2022 |
Educational Services Center | HVAC, Lighting, & Roof Upgrades | 2022 |
Meadowdale Middle | Track Surface Upgrades | 2024 |
Mountlake Terrace High | Gym Bleachers | 2020 |
Mountlake Terrace High | Softball Field, Dugouts, & Bleachers | 2024 |
Seaview Elementary | Gym Floor | 2023 |
Woodway Campus | Asbestos Tile Mitigation & Flooring Replacement | 2023 |
Portables | Portable Moves/Adds (CWE, EWH, FAMS, HTE, TPE) | 2020/21/22 |
Partnership Ongoing & Future Projects
Location | Description | Year to Complete |
---|---|---|
District-Wide | Energy Efficiency | Ongoing |
Chase Lake Elementary | Cafeteria Sound System | 2025 |
Edmonds Elementary | Boiler | 2025 |
Partnership Completed Projects
Location | Description | Year Completed |
---|---|---|
Chase Lake Elementary | Walking Path | 2024 |
Edmonds Elementary | Outdoor Classroom | 2025 |
Chase Lake Elementary | Outdoor Learning Space | 2025 |
Seaview Elementary | Gym Climbing Wall | 2025 |
Seaview Elementary | Gym Sound System | 2024 |
Terrace Park Elementary | Commons Shades | 2024 |
Upgrades & Renewals News
The first phase of the Mountlake Terrace Highschool HVAC project completed this September with functional replacement of the boilers, domestic hot water systems and associated pumps. The district is entering negotiations to establish a guaranteed maximum price with the progressive design builder, Hermanson Company, for Installation of new supply, return and exhaust fans, chilled water and associated ductwork. Work for the airside and chillers would proceed immediately, with non disruptive scopes all school year and finishing in August 2025.
Various efforts are underway to reduce the district's overall energy consumption and to comply with the clean buildings act. HVAC scheduling has been adjusted district wide, especially off the heels of changes made during Covid to reduce unnecessary runtime of equipment. Aging boiler infrastructure is being replaced with new high efficiency and reliable models, this effort is starting at our older single boiler elementary schools Sherwood Elementary, Edmonds Elementary among others. LED replacements are underway at Lynnwood High and Edmond Woodway High and will be followed by our other secondary sites. We are also in the process of performing Ashrae II Audits at our largest sites which will identify further energy efficiency measures (EEM’s) which we will begin to execute as soon as funding is available.