Projects By Site

Upgrade and Renewal Projects Summary

The following is a detailed list of Renewal and Upgrade projects we anticipate for the 2024 Levy and Bond. Our goal is to evenly distribute projects across the District. The Levy projects are identified in orange and the Bond projects in blue.

Project Types and Projects

2024 Levy Proposal

2024 Bond Proposal

Site Upgrades, Fields, Field Turf, Tracks Replacements $14,000,000

$1,600,000

Meadowdale High Baseball Turf Field     
Meadowdale High Softball Turf Field     
Stadium Synthetic Track, Drainage     
Alderwood Middle Field Turf     
Meadowdale Middle Field Project     
Stadium Ticket Booth, Gates     
Hazelwood Playground Equipment     
Sherwood Fire Lane, Waterline, Paving     
Boilers, HVAC Replacements and Upgrades $11,750,000 $3,000,000
Meadowdale High Boiler     
Edmonds-Woodway High Boiler HVAC     
Lynnwood High Dampers Piping     
Hazelwood Elementary Boiler HVAC     
Hilltop Elementary Boiler HVAC     
Brier Elementary Boiler HVAC     
Sherwood Elementary Boiler HVAC     
Edmonds Elementary Boiler     
Roofs and Building Envelope Upgrades $7,000,000 $7,000,000
Sherwood Elementary Reroof     
Hilltop Elementary Reroof     
Meadowdale Elementary Reroof     
Cedar Valley Elementary Reroof     
Cedar Valley Elementary Windows     
Martha Lake Elementary Windows and Doors     
Terrace Park Elementary Windows and Doors     
Maplewood K-8 Floor Replacement     
Relocatables $3,500,000  
 Relocatables     
Lighting Upgrades, Building Technology Lifecycle, Accessibility $3,500,000 $14,850,000
Security Technology Lifecycle (+ Lockdown Indicators)     
LEDs Retrofit Test Site (Various)     
Accessibility - ADA, Restroom upgrades (District-wide)     
Partnerships with other Government Entities     
Intercoms (District-wide)     
Flooring (District-wide)     
Edmonds-Woodway Stage Lighting     
Lynnwood High Stage Lighting     
Meadowdale High Stage Lighting     
Mountlake Terrace High Stage Lighting     
Meadowdale High Gym Bleachers     
Woodway Campus Interior Upgrades     
Terrace Park El Operable Partitions     
6th Grade to Middle School   $1,500,000
Alderwood Middle School     
Meadowdale Middle School     
Physical Security Upgrades   $4,000,000
Plumbing Upgrades   $2,800,000
Drinking Water (District-wide)     
Maplewood K-8 Sprinkler Piping     
Maintenance & Transportation Water @ North Entry     
Election Costs $250,000 $250,000
  $40,000,000 $35,000,000