List of Projects for Elementary and K-8 Schools
Did you know? Money from the 2006 Capital Construction Bond and from the sale or ground lease of district property legally must go toward capital improvements. It cannot help fund instruction or staffing needs.
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.
Elementary and K-8 Schools
Beverly Elementary
Location: 5221 168th Street SW, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy |
Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. |
Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs |
Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Replace carpet | 2012 |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Replace HVAC system |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Replace moveable partition for stage |
|
2006 Capital Construction Bond |
Replace gym floor |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Capital Partnership Program: playground feature |
|
2004 Capital Levy |
Field improvements: backstop upgrade |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Brier Elementary
Location: 3625 232nd Street SW, Brier
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Revise traffic and parking |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Capital Partnership Program: track |
|
2004 Capital Levy |
Field improvements: fencing |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Cedar Valley Community School
Location: 19200 56th Avenue W, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Field improvements: backstop upgrade |
|
2004 Capital Levy |
Capital Partnership Program: fastpitch field |
Project revised |
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Cedar Way Elementary
Location: 22222 39th Avenue W, Mountlake Terrace
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Replace carpet | 2012 |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2008 Technology/Capital Levy | Capital Partnership Program: playground | 2011 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Field improvements: backstop upgrade |
|
2004 Capital Levy |
Field improvements: fencing |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Chase Lake Community School
Location: 21603 84th Avenue W, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
College Place Elementary
Location: 20401 76th Avenue W, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Replace playground paving |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Field improvements: fencing |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Edmonds Elementary
Location: 1215 Olympic Avenue, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2006 Capital Construction Bond |
Replace domestic water piping |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Improve office circulation |
|
2006 Capital Construction Bond |
Replace gym floor |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Field improvements: fencing |
|
2004 Capital Levy |
Capital Partnership Program: playground |
|
2004 Capital Levy |
Capital Partnership Program: field renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Hazelwood Elementary
Location: 3300 204th Street SW, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Resolve off-site drainage |
Pending |
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Upgrade data cabling |
|
2004 Capital Levy |
Capital Partnership Program: stairs and outdoor instructional seating |
Project Canceled |
2004 Capital Levy |
Field improvements: fencing |
|
2004 Capital Levy |
Field improvements: backstop upgrade and drainage, irrigation, and turf renovations |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Hilltop Elementary
Location: 20425 Damson Road, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2008 Technology/Capital Levy | Capital Partnership Program: readerboard |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Field improvements: backstop upgrade |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovations |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Lynndale Elementary
Location: 7200 191st Place SW, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
Revenue from Surplus Property |
Build new school facility |
TBD* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
Project Canceled |
2006 Capital Construction Bond |
Replace gym floor |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Capital Partnership Program: reader board |
|
2004 Capital Levy |
Field improvements: asphalt |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Lynnwood Elementary
Location: 18638 44th Avenue W, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Replace multi-purpose room platform steps |
|
2006 Capital Construction Bond |
Revise traffic and parking |
|
2006 Capital Construction Bond |
Improve acoustics in multi-purpose room |
Pending |
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Capital Partnership Program: fencing and reader board |
|
2004 Capital Levy |
Field improvements: backstop upgrade |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Field improvements: asphalt |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Madrona School
Location: 9300 236th Street SW, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
Revenue from Surplus Property
Build new school facility
TBD*
2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing 2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing 2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing 2008 Technology/Capital Levy Technology: Replace technology lab computers Summer 20112006 Capital Construction Bond
Install emergency storage structure
2004 Capital Levy
Technology: Install a projector, document presenter, and instructional laptop in each classroom
2004 Capital Levy
Technology: Install mobile lab equipment
2004 Capital Levy
Technology: Install additional computers in classrooms
2004 Capital Levy
Field improvements: backstop upgrade
Project Canceled
2004 Capital Levy
Capital Partnership Program: emergency structure
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.
Maplewood Parent Co-Op
Location: 8500 200th Street SW, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Technology: Replace technology lab computers |
|
2008 Technology/Capital Levy | Replace skylight |
|
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2011 |
2008 Technology/Capital Levy | Capital Partnership Program: walking path |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Martha Lake Elementary
Location: 17500 Larch Way, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install roof protection anchor system |
|
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2008 Technology/Capital Levy | Capital Partnership Program: playground | 2011 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Meadowdale Elementary
Location: 6505 168th Street SW, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Capital Partnership Program: playground feature |
|
2004 Capital Levy |
Field improvements: fencing |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Mountlake Terrace Elementary
Location: 22001 52nd Avenue W, Mountlake Terrace
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Oak Heights Elementary
Location: 15500 18th Avenue W, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Upgrade covered play structure |
Pending |
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
2004 Capital Levy |
Capital Partnership Program: playground feature |
|
2004 Capital Levy |
Field improvements: backstop upgrade and drainage, irrigation, and turf renovation |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Seaview Elementary
Location: 8426 188th Street SW, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Sherwood Elementary
Location: 22901 106th Avenue W, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Spruce Elementary
Location: 17405 Spruce Way, Lynnwood
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2006 Capital Construction Bond |
|
|
2006 Capital Construction Bond |
|
|
2006 Capital Construction Bond |
|
|
2004 Capital Levy |
|
|
2004 Capital Levy |
|
|
2004 Capital Levy |
|
|
2004 Capital Levy |
|
|
2004 Capital Levy |
|
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Terrace Park School
Location: 5409 228th Street SW, Mountlake Terrace
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures | 2012 |
2008 Technology/Capital Levy | Capital Partnership Program: playground |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |
Westgate Elementary
Location: 9601 220th Street SW, Edmonds
Funding Source |
Project Description |
Est. Completion Date* |
2008 Technology/Capital Levy | Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. | Ongoing |
2008 Technology/Capital Levy | Technology: Install additional mobile computer labs | Ongoing |
2008 Technology/Capital Levy | Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs | Ongoing |
2008 Technology/Capital Levy | Replace school roof | 2012 |
2008 Technology/Capital Levy | Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures |
|
2008 Technology/Capital Levy | Capital Partnership Program: playground |
|
2006 Capital Construction Bond |
Install emergency storage structure |
|
2006 Capital Construction Bond |
Upgrade data cabling |
|
2006 Capital Construction Bond |
Replace gym flooring |
|
2004 Capital Levy |
Technology: Install a projector, document presenter, and instructional laptop in each classroom |
|
2004 Capital Levy |
Technology: Install mobile lab equipment |
|
2004 Capital Levy |
Technology: Install additional computers in classrooms |
|
2004 Capital Levy |
Field improvements: asphalt and fencing |
|
2004 Capital Levy |
Field improvements: drainage, irrigation, and turf renovation |
|
2004 Capital Levy |
Earthquake safety upgrades |
|
*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site. |