Timeline: Capital Improvements Across the District

Did you know? Money from the 2006 Capital Construction Bond and from the sale or ground lease of district property legally must go toward capital improvements. It cannot help fund instruction or staffing needs.

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Elementary and K-8 Schools

Beverly Elementary
Location: 5221 168th Street SW, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy

Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment.

Ongoing

2008 Technology/Capital Levy Technology: Install additional mobile computer labs

Ongoing

2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Replace carpet 2012
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Replace HVAC system

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Replace moveable partition for stage

Check

2006 Capital Construction Bond

Replace gym floor

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Capital Partnership Program: playground feature

Check

2004 Capital Levy

Field improvements: backstop upgrade

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Brier Elementary
Location: 3625 232nd Street SW, Brier

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Revise traffic and parking

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Capital Partnership Program: track

Check

2004 Capital Levy

Field improvements: fencing

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Cedar Valley Community School
Location: 19200 56th Avenue W, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Field improvements: backstop upgrade

Check

2004 Capital Levy

Capital Partnership Program: fastpitch field
**Project revised to be at Edmonds-Woodway High

Project revised

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Cedar Way Elementary
Location: 22222 39th Avenue W, Mountlake Terrace

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Replace carpet 2012
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2008 Technology/Capital Levy Capital Partnership Program: playground 2011

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Field improvements: backstop upgrade

Check

2004 Capital Levy

Field improvements: fencing

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Chase Lake Community School
Location: 21603 84th Avenue W, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

College Place Elementary
Location: 20401 76th Avenue W, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Replace playground paving

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Field improvements: fencing

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Edmonds Elementary
Location: 1215 Olympic Avenue, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012

2006 Capital Construction Bond

Replace domestic water piping

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Improve office circulation

Check

2006 Capital Construction Bond

Replace gym floor

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Field improvements: fencing

Check

2004 Capital Levy

Capital Partnership Program: playground

Check

2004 Capital Levy

Capital Partnership Program: field renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Hazelwood Elementary
Location: 3300 204th Street SW, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Resolve off-site drainage

Pending

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Upgrade data cabling

Check

2004 Capital Levy

Capital Partnership Program: stairs and outdoor instructional seating
Updated: Project Canceled

Project Canceled

2004 Capital Levy

Field improvements: fencing

Check

2004 Capital Levy

Field improvements: backstop upgrade and drainage, irrigation, and turf renovations

Check

2004 Capital Levy

Earthquake safety upgrades

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Hilltop Elementary
Location: 20425 Damson Road, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012
2008 Technology/Capital Levy Capital Partnership Program: readerboard

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Field improvements: backstop upgrade

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovations

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Lynndale Elementary
Location: 7200 191st Place SW, Lynnwood

Funding Source

Project Description

Est. Completion Date*

Revenue from Surplus Property

Build new school facility

TBD*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Project Canceled

2006 Capital Construction Bond

Replace gym floor

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Capital Partnership Program: reader board

Check

2004 Capital Levy

Field improvements: asphalt

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Lynnwood Elementary
Location: 18638 44th Avenue W, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Replace multi-purpose room platform steps

Check

2006 Capital Construction Bond

Revise traffic and parking

Check

2006 Capital Construction Bond

Improve acoustics in multi-purpose room

Pending

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Capital Partnership Program: fencing and reader board

Check

2004 Capital Levy

Field improvements: backstop upgrade

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Field improvements: asphalt

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Madrona School
Location: 9300 236th Street SW, Edmonds

Funding Source

Project Description

Est. Completion Date*

>

Revenue from Surplus Property

Build new school facility

TBD*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing 2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing 2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing 2008 Technology/Capital Levy Technology: Replace technology lab computers Summer 2011

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Field improvements: backstop upgrade

Project Canceled

2004 Capital Levy

Capital Partnership Program: emergency structure

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Maplewood Parent Co-Op
Location: 8500 200th Street SW, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Technology: Replace technology lab computers

Check

2008 Technology/Capital Levy Replace skylight

Check

2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2011
2008 Technology/Capital Levy Capital Partnership Program: walking path

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Martha Lake Elementary
Location: 17500 Larch Way, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install roof protection anchor system

Check

2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012
2008 Technology/Capital Levy Capital Partnership Program: playground 2011

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Meadowdale Elementary
Location: 6505 168th Street SW, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Capital Partnership Program: playground feature

Check

2004 Capital Levy

Field improvements: fencing

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Mountlake Terrace Elementary
Location: 22001 52nd Avenue W, Mountlake Terrace

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Oak Heights Elementary
Location: 15500 18th Avenue W, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Upgrade covered play structure

Pending

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

2004 Capital Levy

Capital Partnership Program: playground feature

Check

2004 Capital Levy

Field improvements: backstop upgrade and drainage, irrigation, and turf renovation

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Seaview Elementary
Location: 8426 188th Street SW, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Sherwood Elementary
Location: 22901 106th Avenue W, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Earthquake safety upgrades

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Spruce Elementary
Location: 17405 Spruce Way, Lynnwood

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2006 Capital Construction Bond

  • Install emergency storage structure

Check

2006 Capital Construction Bond

  • Upgrade data cabling

Check

2006 Capital Construction Bond

  • Replace HVAC system

Check

2004 Capital Levy

  • Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

  • Technology: Install mobile lab equipment

Check

2004 Capital Levy

  • Technology: Install additional computers in classrooms

Check

2004 Capital Levy

  • Earthquake safety upgrades

Check

2004 Capital Levy

  • Field improvements: backstop upgrade

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Terrace Park School
Location: 5409 228th Street SW, Mountlake Terrace

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures 2012
2008 Technology/Capital Levy Capital Partnership Program: playground

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.

Westgate Elementary
Location: 9601 220th Street SW, Edmonds

Funding Source

Project Description

Est. Completion Date*

2008 Technology/Capital Levy Technology: Replace equipment purchased by the 2004 Capital Levy, including projector, document presenter, and instructional laptop in each classroom; mobile computer lab equipment; computers in classrooms; and library circulation desk equipment. Ongoing
2008 Technology/Capital Levy Technology: Install additional mobile computer labs Ongoing
2008 Technology/Capital Levy Technology: Create a new school website to improve communication with the public and develop an internal website to support staff needs Ongoing
2008 Technology/Capital Levy Replace school roof 2012
2008 Technology/Capital Levy Install HVAC digital control system to improve energy efficiency and improve our ability to maintain building temperatures

Check

2008 Technology/Capital Levy Capital Partnership Program: playground

Check

2006 Capital Construction Bond

Install emergency storage structure

Check

2006 Capital Construction Bond

Upgrade data cabling

Check

2006 Capital Construction Bond

Replace gym flooring

Check

2004 Capital Levy

Technology: Install a projector, document presenter, and instructional laptop in each classroom

Check

2004 Capital Levy

Technology: Install mobile lab equipment

Check

2004 Capital Levy

Technology: Install additional computers in classrooms

Check

2004 Capital Levy

Field improvements: asphalt and fencing

Check

2004 Capital Levy

Field improvements: drainage, irrigation, and turf renovation

Check

2004 Capital Levy

Earthquake safety upgrades

Check

*Please note: The Edmonds School District is committed to completing the capital improvement work at each school as outlined on this web site. However, all timelines are dependent on a variety of factors and are subject to change. Any changes will be updated as soon as possible on this web site.