Students greeted their new school when doors opened upon the start of the 2000-2001 school year. The new two-story school was built on the existing site.
A central circulation area showcases the structure. The entrances to the library and commons spaces are a focus on arrival inside the entrance to the building.
Students arriving by bus utilize a separate drive and entrance to the building from those arriving at the visitor/parent drop-off entrance area at the front of the school. The facility is designed to accommodate 575 students.
Program Features
- 24 Classrooms - 4 Learning Centers, each with a Shared Space and 6 classrooms
- Commons with Stage and Gym linked by an operable partition, which can be opened to provide space for large gatherings and performances
- Parent/Community Room
- Outdoor Learning Spaces/Play Area and ball fields
- Covered outdoor play area
- Library with adjacent computer lab and media room
Area: 56,044 s.f.
Start of Design: February 1998
Start of Construction: July 1999
Occupancy: September 2000
Principal at Construction: Patricia Johnson
Project Manager: Roger Schultz
Architect: Bassetti Architects, Seattle, WA