Location-18218 North Road |
OpeningFall 2009 – Current seventhgraders
will be the fi rst freshman class. |
Groundbreaking June 19, 2007 –June 19, 2007 – Future students had the honor ofbreaking ground before 200 attendees during a ceremony and celebration on the site. |
Funding-Voter-approved 2006 Capital Construction Bond - total project cost - $99.8 million. |
Central Gathering Area – Primary, central
gathering place and space for performances. |
Building – Two-story, fully accessible school
building is approximately 214,000 square feet and is designed to accommodate 1,600 students and 100 staff. |
Environment – Wetlands provide on-site
educational opportunities. |
Arts and Drama – A 350-seat performanceoriented
theater with thrust stage and 35-seat orchestra pit will be the focal point of the schools’
music and drama programs. |
Energy Effi ciency – Natural lighting, ventilation,
and heating and cooling design plan received recognition from Snohomish County PUD and
OSPI. |
Community – The library and fi elds will be
available for community use. |