Meadowdale Middle School

MMS Exterior

 

CONTRACTOR: Skanska

ARCHITECT: Integrus Architecture

People's Choice Award

 

 

DESIGN GRAPHICS

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

SITE FEATURES:

17-acre site with wooded area at west end

Outdoor learning area with native vegetation & wetlands

Storm water storage cistern & open air detention ponds

One multi use soccer / football field

Cinder surface track

Multi use ball field

Site trails that are linked to outdoor learning

Amphitheater outside of the library

Student gardens

Outdoor Student Plaza with asphalt basketball court

Easily accessed parking lot for community use

BUILDING FEATURES:

750 students; grades 7-8

98,933 square ft, 2 story design

Five “Personalized Learning Communities”

Naturally day lit and ventilated

Hard wired and wireless internet access throughout

Daylighting sensing lighting systems

Automated shading systems

State of the art security and telephone systems

Condensing boilers heat system

Main & auxiliary gymnasiums w/separate community access

Manufacturing shop and drafting lab

Site Plan Floor Plans

 

AERIAL PHOTO DOCUMENTATION OF THE PROJECT

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

DAILY CONSTRUCTION OF THE PROJECT

September 2009 through December 2009

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

 

January 2010 through March 2010

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

 

April 2010 through June 2010

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

 

July 2010

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

Aug 2010 through Sept 2010

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

Oct 2010 through Nov 2010

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

Dec 2010 through Jan 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

Feb - March 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

April 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

May 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

June 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

July thru Nov 2011

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

 

 

F A Q

When did construction start? Summer of 2009.

When was the new school ready? The project achieved substantial completion in August 2011 and students occupied the school in September 2011. 

Where is the new building be located? The new building was constructed to the west of the existing main building. It extends from about the location of the old gym out into the previous baseball field.

Where did students attend school during construction? Students went to classes in the existing buildings while the new schools was being built. The technology shop was demolished early in the construction process to allow building the new gym. When the new gym was complete, it was used while the old gym/music building was demolished.

How is this project being funded? This project was approved by the voters as part of the 2006 Bond measure, which is also funding the new Lynnwood High School, and other facilities improvements. The District will be applying for State construction matching funds as well.