Meadowdale Elementary School

Meadowdale Elementary School

Students were welcomed to the opening of their new school when they returned from summer break in the fall of 2000.

The new two-story school was built on the same site as the old school. The connecting Commons/Gym structure as well as classroom buildings all surround a central outside courtyard.

The library is located on the 2nd floor immediately above the Admin offices at the main entrance to the school.

Students arriving by bus utilize a separate drive and entrance to the building from those arriving at the visitor/parent drop-off entrance area at the front of the school. The facility is designed to accommodate 575 students.

 

PROGRAM FEATURES
24 Classrooms - 4 Learning Centers, each with a Shared Space and 6 classrooms

Commons with Stage and Gym linked by an operable partition, which can be opened to provide space for large gatherings and performances

Central outside courtyard for student gatherings or performances

Outdoor learning spaces/play areas and ball fields

Library with adjacent computer lab and media room

 

AREA: 56,460 square feet

SCHEDULE
Start of Design – October 1997
Start of Construction – July 1999
Substantial Completion – October 2000
Occupancy – September 2000

Principal at Construction: Kyle Kinoshita
Project Manager: Roger Schultz
Architect: Bassetti Architects

 

DESIGN GRAPHICS

 


 CONSTRUCTION PHOTOS

 

[ModuleInstance->Description]

You need at least version 7 of Flash player. Download latest version here!

Website by SchoolMessenger Presence. © 2017 West Corporation. All rights reserved.